Your First Solar Install: What to Expect from Survey to Switch-On

If you're thinking about installing solar panels for the first time, it’s natural to have questions. What’s involved? How long does it take? Will my home be disrupted?

Whether you're going solar to cut bills, reduce carbon emissions, or become more energy independent, understanding the full process can help you feel confident in your decision. In this guide, we’ll walk you through every stage — from the initial survey to that satisfying switch-on moment.

 
  • What to Expect:

    • A friendly chat to understand your goals (e.g. lower bills, self-sufficiency, etc.)

    • Review of your property layout, roof space, and energy usage

    • Assessment of shading, orientation, and structural suitability

    Why It Matters:

    The survey ensures that your solar system is tailored to your property and energy needs. You’ll also receive a quote and system design proposal — including potential energy savings and payback time.

    Top Tip: Be ready with a recent energy bill so we can size your system accurately.

  • Once your property is assessed, your installer will create a custom system design. This includes:

    • Number and placement of panels

    • Inverter location

    • Optional battery storage

    • Expected annual generation (kWh)

    • Estimated return on investment (ROI)

    You’ll be presented with a full proposal and the opportunity to ask any questions.

    Good installers will also confirm any necessary permissions or planning requirements at this stage (usually not needed unless you live in a listed building or conservation area).

  • Once you’re happy with the design and pricing, you’ll confirm the installation and pay a deposit (usually around 25%).

    Your installer will then:

    • Order your equipment

    • Book scaffolders (if needed)

    • Confirm your installation dates

    Most systems are booked in within 2–4 weeks, depending on availability and season.

  • What Happens:

    • Day 1: Scaffold goes up (if needed)

    • Day 2: Panels installed on the roof, inverter fitted inside (usually in a loft, garage or utility room)

    • Optional: Battery storage and EV charger installed

    A standard residential system takes 1–2 days to install.

    Disruption:

    • Minor — installers will need access to your fuse board, loft, and possibly your internet router (for smart monitoring)

    • No power? Just a short switch-off when connecting your inverter

    All work is carried out by qualified electricians and MCS-accredited installers.

  • Once installed:

    • The system is thoroughly tested

    • All components are registered with the DNO (your local electricity network)

    • You receive full handover documents, including warranties, user guide and system performance info

    Some installers will also help set up your online monitoring app, so you can track your solar production from your phone or tablet.

  • With everything tested and signed off, your system is switched on — and your solar journey begins!

    From this point:

    • You’ll start using free solar electricity right away

    • Any unused power will be exported to the grid (if you're on the Smart Export Guarantee)

    • Your monitoring app will show how much you’re generating and using

    It's a good feeling watching your electricity meter slow down as the panels do their thing!

  • A good installer won’t disappear after the job’s done.

    At Solar Synergy Solutions, we:

    • Monitor your system performance (remotely, if enabled)

    • Offer maintenance support and warranty checks

    • Help with SEG export registration

    • Provide guidance on battery upgrades or EV charger add-ons

    • Full MCS Certification (needed for SEG payments)

    • DNO notification confirmation

    • Warranty documents (typically 10–25 years for panels)

    • System performance estimate

    • User guide and app setup help

 

Common Questions

Do I need planning permission?

In most cases, no — solar panels are considered permitted development. You might need permission for listed buildings or flats.

Can I install a battery later?

Absolutely. Many systems are designed with battery-ready inverters so you can add storage in future.

What happens on cloudy days?

Your system will still generate electricity, just at a lower rate. It’s still enough to offset some of your usage.

 

Ready to Get Started?

Going solar is one of the smartest moves you can make in 2025.

If you’re ready to take the next step or just want a free consultation, get in touch with us today.

Whether you want to lower bills, cut carbon, or gain energy independence — we’ll guide you through the process from survey to switch-on.

Book a free consultation or call us today on 07779 996 116 to see what solar could do for you.

Previous
Previous

Maintaining Your Solar Panels: What to Check and When

Next
Next

Grants and Incentives for Going Solar in the UK (2025 Edition)